|

Build Your Online Product Catalogs?
Product Name: |
plasterboard equipment
|
Supply Ability: |
200 |
Related proudcts |
|
Specifications |
100*80 |
Price Term: |
|
Port of loading: |
|
Minimum Order |
|
Unit Price: |
|
|
Gypsum board machinery feasibility report
1¡¢ Market forecasting The gypsum board is light, fire-resistant¡¢warm¡¢insulated and moisture resistance and it is the necessary material in the ceiling and interior decoration. The gypsum board becomes popular since 1979. In the recent years, the gypsum board capacity rises year by year and become the pillar industry. With the adjustment of national Industry Policy, the newly decoration material will be used in the big and small cities as well as home decoration. Thus, the gypsum board has ***cious potential market in these years. 2¡¢Required conditions Take the 4 million square meter as an example, it should meet the following standard: £¨1£©Electricity supply£ºThe total power supply should be 300KW(including the residents electricity). £¨2£©Water supply£º6 Cubic Meters/hour £¨3£©The total floor area is about 7000 square meters£¬workshop about1500 square meters. £¨4£©Have good transport and telecommunication services. 3¡¢Environment Protection The main ingredient is gypsum powder(natural gypsum¡¢ardealite). All the process is equipped with dust-collect system, won¡¯t pollute the environment. The heat supply device is hot-oil conductive boiler; its emission concentration meets the national standard. 4¡¢The gypsum board process is as following£º Plaster hopper---mixing---shaping---freezing---first cutting---drying ---***ailed cutting---packing---finished products 5¡¢Raw material consumption£¨square meter£© gypsum powder£º6.8kg¡¢shielding paper£º0.5kg¡¢coal0.9kg¡¢starch£º40g¡¢foaming agent£º5g¡¢glue£º10g¡¢electricity£º0.3kwh 6¡¢staffing: take the 4 million S.Q.M. production line as an example£¬it will need office staff 5 people and workers12 people (namely 17 people) per shift. 7¡¢Construction Progress: Project Approval¡¢Process Layout¡¢civil engineering equipment selection¡¢production installation and commissioning. It will need about 5 months. 8¡¢conclusion a£© It is Newly green decoration material, little inve |
Company: |
Xingye Decorative Materials Co.,Ltd.
|
Contact: |
Mr. Jake Song |
Address: |
Huaishu Development Zone |
Postcode: |
052260 |
Tel: |
86 311 84330198 |
Fax: |
86 311 84330193 |
E-mail: |
|
|
|
|